Two 25-year-old office lifts brought up to current standards — one at a time, so tenants were never left without a lift.

The challenge

Frequent breakdowns, obsolete spare parts and uneven stopping were frustrating tenants — but replacing both lifts outright would have closed the building for months.

Our solution

We kept the sound structure and rails and replaced everything that wears out: controllers, variable-frequency drives, door operators and safety gear. Both cabins were refurbished with new panels, LED lighting and accessible push buttons.

Technical specifications

Lifts
2 × traction (modernised)
Rated load
800 kg / 10 persons
Speed
1.0 m/s
Stops
6
New controllers
Microprocessor, remote diagnostics
New drive
VVVF, soft start/stop
Doors
New automatic operators
Cabin
New panels, LED ceiling, EN 81-70 buttons
Standards
EN 81-20 upgrades

Scope of work

  • Condition survey and report
  • Phased modernisation plan
  • Controller, drive and door upgrades
  • Cabin refurbishment
  • Re-certification
  • Maintenance contract

Client feedback

What the client says

Our two lifts were modernised one at a time, so tenants were never without access. Breakdowns have practically disappeared and the new cabins look like new lifts.

Rachel Grech Facilities Manager, Office block, Birkirkara

Planning a new lift or an upgrade?

Tell us about the building. We will arrange a site visit, take measurements and send you a clear quotation.

Request a quote

Contact us

We reply to every enquiry within one working day. Lift breakdown? Call +356 9999 9281, 24/7.

Contact form

Loads Google Maps

24/7 emergency line +356 9999 9281